BTRA Celebrates Key Role in Mumbai Trans Harbour Link Project

We are thrilled to announce the inauguration of the Mumbai Trans Harbour Link (MTHL), marking a day filled with great pride. 

The BTRA team takes immense honour in playing a pivotal role in this groundbreaking project. Our unwavering dedication has been instrumental in ensuring the MTHL’s structural strength and longevity.

We have undertaken extensive Field Density tests for both L&T Package 1 and Package 3, guaranteeing that this remarkable bridge surpasses the highest construction standards. 

Additionally, we have faced the challenge of evaluating the waterproofing membranes for the bridge deck through a variety of rigorous assessments, including shear strength, FTIR, and tensile strain elongation. These thorough tests demonstrate our commitment to delivering infrastructure that not only stands tall but also withstands the test of time.

With the opening of the MTHL, we extend heartfelt thanks to our exceptional team and collaborators, whose contributions have made this milestone possible. Let us all come together to celebrate not just a bridge but a symbol of connectivity and progress for the city of Mumbai. 

Join us in commemorating this significant achievement, toasting effortless journeys, fortified foundations, and the enduring legacy of the Mumbai Trans Harbour Link!

Leave a Comment

Your email address will not be published. Required fields are marked *